Small TalkRiver suspected development of real estate is fill

30.10.2013, 16:28 - fwjv38pt8 - Anfänger - 3 Posts

And basically clear that the new office of the land fill the river will be developed.
While in the other side of Wan Village Green Village, between May and June of 2008, after some heavy rain, piano broken embankment river water will diffuse through large tracts of farmland submerged.
located upstream of the town of Li Ann flow angle Pa concave back village group, because the low-lying, flood comes,abercrombie, bear the brunt of a flooded rice field near mu.
In this regard, ZENG Chong-hui did not agree.
"Keep also keep, and then further to fill 30 meters no problem." Hu Jun Yan said.
are stacked to a nearby ground, and then another hook machine sand fill these low-lying areas to the river.
"Villagers fear is unnecessary." Streaming Ann town,doudoune moncler, an official said reinforced embankment length,hollister, width and other parameters are the five County Water Conservancy Bureau, after scientific investigation, according to the actual situation of the design, and engineering has got
Editor: last month held a central rural work conference will Tai Hing Water as the focus of this year's agricultural and rural work.
Face funding difficulties, some places try to introduce social capital to participate in water conservancy construction, this approach gives business development-related projects and public works in the dual attributes.
A boss from the Village Green eventually became Qin Jiang An stream segment dike reinforcement project of the first phase of investment in people.
Some people say that the land was given to the construction of real estate investment Xiudi boss, it was said the town government will build a commercial street in the above.
ROI means unknown project started, the local villagers found, Qin Jiang river is filled from both sides inwards into the 80 meters, resulting in the river channels and fashioned an area of ??about dozens of acres of land.
Many people believe that this is not a simple embankment reinforcement.
Land and water conservancy department approval,abercrombie.
For a long time, since the levees disrepair, a flood season, piano Riverbanks often suffered flooding villages, villagers suffering from the pain of floods.
He told the Southern Rural News reporter,hollister, construction began last year, it was thought that repair embankments, can be nearly a year later,hogan, has not only completed embankments,parajumpers outlet, river but was filled narrow 80 m.
For this mountain town, the money is not a small number.
'an stream near the bridge about 500 meters long section of the river shore piano, a busy scene: a hook machine is shallow water, digging into the sand and stopped at the river bank of the truck; sand then
In front of the project, so that the villagers Ann Chen Hui Tong town of 10,000 streaming mode Heart doubts.
It seems at once Chong-hui, attract investment to build dikes,woolrich, make this livelihood projects to find a building "shortcut."
Villagers worry exacerbate flooding in 60 years in accordance with one hand, flood control standard reinforced embankments,hollister online shop, the other newly built dozens of acres of land planning and development - of this "double-edged sword," the idea, some officials in the town of Ann flow quite enjoy.
Zeng Hui Chong told the Southern Rural News reporter, five Chinese government has verbally agreed to be developed on the land, and how the development will have to further study.
In addition to superior financial allocations over 100 million, we need to secure the remaining funds raised stream town.
"(Project has not yet been commenced) mainly because of financial difficulties." January 6, deputy mayor of the town was safe flow Chong-hui told the Southern Rural News reporter, the first phase of the embankment reinforcement project budget 3.6428 million yuan.
Another argument began to spread in the village - only the relevant departments under the guise of building embankments, and its real purpose is diverted river construction real estate projects.
years, has now been severely damaged.
For a time,hollister france, investors and government "Xiudi profit" argument was widely disseminated in the town of Ann flow.
"In the past as long as several days of heavy rain, the river water level becomes very high harp." January 6, Ann town of Green River flows village director Hu Jun Yan told the Southern Rural News reporter, Green Village section of embankment built in the sixties and seventies of the last century,
Bok village director Hu Jun Yan,parajumpers, said Qin Jiang An stream segment embankment reinforcement project first phase also takes up part of the village collective land for development if required Grenelle.
He told the Southern Rural News reporter: "the town from which the government never thought about making money, and now a land did not sell." It is understood that investors have invested in embankment projects more than 700 million.
An stream town most of the residents living in 140,000 Qin Jiang River.
ZENG Chong Hui told reporters, engineering to achieve a "flood embankment construction" and "economic development" combination.
Hu Jun Yan believes that Qin Jiang rare floods, the river bed is not necessary to remain so wide.
ZENG Chong-hui, Qin Jiang part of the river channel width of less than 200 meters,barbour outlet, while the construction of the piano now nearly 400 meters wide river segment.
(Nanfang Daily reporter Tang Kaifeng Hu Nianfei also contributed to this article)
However, living in several villages piano Riverbanks some villagers,abercrombie pas cher, the government's practice of ignoring the river after being narrowed the potential flood hazard.
It seems the government, which is the government and enterprises have to win three people move; while in the public sector seems behind the opaque operations, business interests are trying to "kidnap" livelihood projects.
As early as 2005, five County Water Conservancy Bureau, the relevant planning on doing, intends to Qin Jiang An embankment of sixth stream segment for reinforcement and repair.
It was not until January 2010, the first phase of the project was the embankment reconstruction stream in the town of Ann groundbreaking.
Therefore, even if the width minus filled, it will not affect the flood.
Attract local notables investment embankment construction, a "cash-strapped" in the town of Ann flow solve financial problems the main ideas.
As to how the compensation, the compensation number, ZENG Chong-hui said that temporarily unclear.
Water conservancy construction to absorb private capital piano meijiang upper reaches of the river, its security section of the river flow width of 400 m.
Villagers recalled, because the water surge, it was in when the bridge Qin Jiang trapped in the safe flow of new bridge piers could not move.
Villagers worry,mulberry outlet, located just downstream river embankment works the corner, where it was filled narrow, the speed will slow down the flood discharged.
January 6, Ann stream town one resident told the Southern Rural News reporter, has already been paid on the new earth to buy land for housing deposit.
For their return on investment issues, ZENG Chong-hui said the government would give investors at an appropriate time, "some compensation."
January 6, one is the river vegetable fertilization Wan Tong villagers worried about telling Southern Rural News reporter; "piece of land previously often flooded, embankments narrowing, the situation will be more serious " And in
For the purpose of this new creation of land, the villagers talking about.
"If the dike is built, there is no accounting for such a wide river." Said Chen Hui-mode.
????????


Staying seduce men refused to find someone to beat the boss blackmail _ News

Network transmission stray dogs Kushou three days without food and drink masters microblogging rumor

36 years older mothers as ear

powered by webSPELL.org